Protest in Arunachal Pradesh against proposed 12,500 mw hydropower project

Hundreds of people demonstrated in Arunachal Pradesh's Upper Siang district on Saturday, protesting the proposed 12,500-mw hydropower project. The protest, organised by the Siang Indigenous Farmers Forum (SIFF), was held in Geku village, opposing the preliminary study being conducted in the area for the Siang Upper Multipurpose Project (SUMP). Around 600 villagers gathered at the spot around 8 am, raising slogans against the National Hydro Electric Power Corporation (NHPC) and Chief Minister Pema Khandu. Geku's Extra Assistant Commissioner A Ratan said the protest was peaceful and ended at 1 pm without any untoward incident. The NHPC has proposed three sites in the Upper Siang and Siang districts for the construction of the dam. One site is between Parong and Deging villages, one at Ugeng near Riga village and another between Ditte-Dime and Geku, officials said. The NHPC has been conducting surveys at the proposed sites to prepare a feasibility report for the project, they said.

Protest in Arunachal Pradesh against proposed 12,500 mw hydropower project

Join our WhatsApp Community to receive travel deals, free stays, and special offers!
- Join Now -

Join our WhatsApp Community to receive travel deals, free stays, and special offers!
- Join Now -

Hundreds of people demonstrated in Arunachal Pradesh's Upper Siang district on Saturday, protesting the proposed 12,500-mw hydropower project. The protest, organised by the Siang Indigenous Farmers Forum (SIFF), was held in Geku village, opposing the preliminary study being conducted in the area for the Siang Upper Multipurpose Project (SUMP). Around 600 villagers gathered at the spot around 8 am, raising slogans against the National Hydro Electric Power Corporation (NHPC) and Chief Minister Pema Khandu. Geku's Extra Assistant Commissioner A Ratan said the protest was peaceful and ended at 1 pm without any untoward incident. The NHPC has proposed three sites in the Upper Siang and Siang districts for the construction of the dam. One site is between Parong and Deging villages, one at Ugeng near Riga village and another between Ditte-Dime and Geku, officials said. The NHPC has been conducting surveys at the proposed sites to prepare a feasibility report for the project, they said.